Updated June 2026 · Awesome Additions · Sample editorial content
Additions are the most permit-intensive residential work, and Trophy Club reviews carefully. Here's the shape of it.
What's typically required
- A building permit with a full plan set — architectural, structural, energy.
- Structural engineering for new loads and the tie-in.
- MEP details, and HOA review where applicable.
Why we permit first in Trophy Club
We finalize design, complete engineering, and get the permit approved before demolition — the single rule that prevents the most common addition delays, part of The AG Standard. Start with room additions in Trophy Club.
Ready to talk specifics?
We design and build additions in Trophy Club.Browse our Trophy Club services or tell us what you're trying to add.
Trophy Club Services →