Once permits are approved and selections are locked, construction follows a predictable rhythm.
The general sequence
- Site prep & demolition — protection goes up first.
- Foundation — footings and slab for the new structure.
- Framing — the addition takes shape; framing inspection.
- Roof, windows & weatherization — closing in the structure.
- MEP rough-in — electrical, plumbing, HVAC; inspections.
- Insulation, drywall & finishes — flooring, paint, trim, fixtures.
- Final inspection & walkthrough — punchlist, then warranty.
How you stay informed
A dedicated PM sends daily updates and tracks the schedule 24/7. You'll live in the home throughout. See how long it takes.